A bolted flange is only as good as two things: its strength under load and its ability to stay sealed. On a hairpin heat exchanger, the flange has to clamp tight enough to seal against the internal pressure while keeping its stresses within the limits of the ASME pressure vessel code.
We ran a static structural finite element analysis (FEA) of the joint in Ansys, with each part in its real ASME material, and analysed it the way it is assembled and used: first the bolts are tightened to a heavy preload of about 1,350 kN, then, with that preload locked in, an internal pressure of 2.07 MPa represents operation. The bolt-up and pressure stresses combine, and it is the combination that decides whether the flange holds and seals.
Objectives
How we set up the flange FEA
Assembly with contact
The full joint was modelled with contact between the mating parts, so the flanges could separate, slide or press together like the real joint.
Bolt pretension
The studs were modelled with pretension elements, so the clamp-up and the way the flanges press together are represented properly.
Step 1: bolt-up
A bolt pretension of about 1,350 kN applied to the studs to clamp the flanges together.
Step 2: operation
The preload locked and an internal pressure of 2.07 MPa applied to the wetted surfaces.
Results
Total deformation, von Mises stress, linearised stresses along classification paths, flange contact pressure and the working load in the bolts.
| Item | Value | Notes |
|---|---|---|
| Flange | SA-105 | Forged carbon steel |
| Pipe | SA-106 Grade B | Carbon steel pipe |
| Studs | SA-193 Grade B7M | Alloy steel bolting |
| Load step 1 | 1,350 kN preload | Bolt-up, before any pressure |
| Load step 2 | 2.07 MPa pressure | Operation, with the preload locked |
| Contact | Flange faces, bolted interfaces | Free to separate, slide or press together |
Results: strength, deformation and sealing
With the preload and the 2.07 MPa pressure both applied, the joint behaved well:

The low overall stress and the small deflection show that the flange, pipe and studs all have healthy strength margins at the rated pressure. For sealing, the contact pressure on the flange faces shows a firm, continuous band right around the joint, even after the internal pressure tries to push the flanges apart: the signature of a joint that will stay leak-tight. The bolt preload was clearly doing its job, without relying on a hand calculation.
Evidence for the ASME sign-off
The study answered both of the client's questions from one model built the way the joint is bolted up and run: the stresses and linearised results are the evidence of strength for the ASME sign-off, and the contact pressure is the evidence of sealing. We explain the code approach in our guide to pressure vessel FEA to ASME Section VIII Division 2.
Frequently asked questions
Why apply the bolt preload before the pressure?
Because that is how the joint is really assembled and used. The preload sets up most of the clamping stress, and the pressure stresses add to it; solving bolt-up first and operation second separates what each does and shows their combination, which is what decides strength and sealing.
Is a 235 MPa peak stress a problem?
Not on its own. It is a small, localised peak at a geometric transition, while the average stress was near 30 MPa. ASME assessments use linearised membrane and bending stresses rather than raw peaks, and the joint showed healthy margins on that basis.
How was sealing checked?
From the contact pressure on the flange faces. A firm, continuous band of contact pressure stayed right around the joint after the 2.07 MPa pressure was applied, showing the preload keeps the joint leak-tight.
Which materials were modelled?
SA-105 forged carbon steel for the flange, SA-106 Grade B for the pipe and SA-193 Grade B7M alloy steel for the studs, each with its own strength properties.